ICOMold ICOMold Online Management
USA Sales and Project Engineer
 → 
Welcome
  Logout


ICOQuote - Instant Online Quote
Michaela Di Cristofaro
Joint Performance
2275 Manor Hill Drive
Mississauga, Ontario L5M5B8 Canada

416-884-1317
Quote Number: U-211026102647
Date: 10/26/2021
Quote Engineer: Lucy Xuan
Project Manager: Brian Enneper

Tooling Cost
ItemSnap ShotPart Number/NameMaterialSurface FinishColorCavitiesSample QuantityMold TypeLead TimeTooling Price with samplesDetails
1IMU Housing - Top.stpABS Chimei PA-757,NaturalStandard No Machine MarkNATURAL COLOR15Production Mold15 Business Days$3,051
2SMALL - Straight Applicator - Top V3.stpABS Chimei PA-757,NaturalStandard No Machine MarkNATURAL COLOR15Production Mold15 Business Days$6,893
3Force Wearable - Bottom V2.stpABS Chimei PA-757,NaturalStandard No Machine MarkNATURAL COLOR15Production Mold15 Business Days$2,231
4RT-Housing-L-V2.stpABS Chimei PA-757,NaturalStandard No Machine MarkNATURAL COLOR15Production Mold15 Business Days$5,995

Part Cost
ItemPart Number/NamePart SizePart WeightPart QuantityPrice without ShippingPrice with FedExPrice with Economy AirPrice with Ocean
1IMU Housing - Top.stp50.8×44.5×6.4mm0.0112kg $0.60$0.86$0.83$1.14
2SMALL - Straight Applicator - Top V3.stp227.0×85.7×12.7mm0.1044kg $1.70$4.03$3.73$2.36
3Force Wearable - Bottom V2.stp31.8×31.8×5.1mm0.0034kg $0.41$0.47$0.46$0.92
4RT-Housing-L-V2.stp95.3×69.9×21.0mm0.0715kg $1.27$2.88$2.67$1.88

    

    
        

Files





1050 Walnut Ridge Drive, Hartland, Wisconsin 53029 (©) 2024 ICOMold By Fathom. All rights reserved.