ICOMold ICOMold Online Management
China Senior Manager
Welcome
  Logout

Supplier Portal Material List

Mold Project: 70249-21-Doctor_Nomo-Shipping cost for assembly parts Customer Name: Kelsey Company Name: Assembly Tool & Automation Status: Part Sent
Start Date: 11/10/2023 12:00:00 AM Start Metal Cut  Due Date:  On Hold Time: 0 days

Project Team: USA Project Engineer: Thalia Wang China Project Engineer: Hu Jia Supplier:  Location:  Life:
USA Accounting: Wendy Wang


Project Quote:  C-221110213023

Tooling Cost
ItemSnap ShotPart Number/NameMaterialSurface FinishColorCavitiesSample QuantityMold TypeLead TimeTooling Price
1keyfob_revisedwallthickness_v05-0625.stpPP K1011,NaturalIM-2 Medium bead blastBLACK PMS-BLACK645Production Mold18 Business Days$9,339
2MagButton_AdjustedMagPocketDiameter_OKToTool_7Sept23.stpABS Chimei PA-757,NaturalIM-2 Medium bead blastBLACK PMS-BLACK685Production Mold15 Business Days$6,138
3wallet-20230827.stpABS Chimei PA-757,NaturalIM-2 Medium bead blastBLACK PMS-BLACK645Production Mold20 Business Days$17,415
4wallet-20230827.stpABS Chimei PA-757,NaturalCustomer Specified FinishBLACK PMS-BLACK645Production Mold20 Business Days$9,670

Part Cost
ItemPart Number/NamePart SizePart WeightPart QuantityNo ShippingAir ShippingOcean Shipping
1keyfob_revisedwallthickness_v05-0625.stp68.6×9.5×38.0mm0.0070kg100$3.14$3.85$14.05
Custom Process Cost1) Labor cost ( install magnet into part) Lead Time: Days
Custom Process Costdouble side tape (3M 5915 24mm x0.4mm) Lead Time: Days
Custom Process Costinstall tape to the magnet Lead Time: Days
2MagButton_AdjustedMagPocketDiameter_OKToTool_7Sept23.stp29.7×29.7×4.2mm0.0013kg44000$0.17$0.22$0.22
Custom Process Costdouble side tape(3M 5930 24mm x0.8mm) Lead Time: Days
Custom Process CostLabor cost (install double side tape to the back side of part) Lead Time: Days
Custom Process CostLabor cost (install magnet into the part, magnet provided by customer) Lead Time: Days
Custom Process Costdouble side tape (3M 5915 24mm x0.4mm) Lead Time: Days
Custom Process Costinstall tape to the magnet Lead Time: Days
3wallet-20230827.stp60.9×14.1×109.5mm0.0175kg11000$0.55$0.88$0.74
4wallet-20230827.stp60.9×14.1×109.5mm0.0175kg500$0.94$1.33$3.15

    



Project Launch Info

Project        Launch for 70249-21-Doctor_Nomo-Shipping cost for assembly parts Assembly Tool & Automation
Project Number:  70249-21-Doctor_Nomo-Shipping cost for assembly parts
Customer PO:  Revision Date:      Rev. R0
Project Start Date:  Samples Ship Date: 
    Customer Due Date:
Samples Shipping Method:  Parts Shipping Method: 
Samples Shipped to:  Parts Shipped to: 
General Remarks: 
QC Remarks: 
Additional Attachment:  Part Shipping Release required: 
Parts used for:  Procure Material for production: 
 

ItemSnap ShotPart Number/NamePart Number on POMaterialSurface FinishColorCavitiesSample QuantityMold TypeOrder Quantity
Project        Tooling Shipping Launch for 70249-21-Doctor_Nomo-Shipping cost for assembly parts Assembly Tool & Automation
Project Number:  70249-21-Doctor_Nomo-Shipping cost for assembly parts
Customer PO: 
Shipping Date: 
Tooling Shipping Method: 
Tooling Shipping to: 
Special Notes: 
Additional Attachment: 

ItemSnap ShotPart Number/NamePart Number on POMaterialSurface FinishCavitiesMold Type


Project Budget

ItemSnap ShotPart Number/NameTooling and Samples BudgetChina Mold POChina Part POOrder QuantityPart BudgetPart Shipping BudgetTooling Shipping Budget
1keyfob_revisedwallthickness_v05-0625.stp0
Custom Process CostSetup:
Custom Process CostSetup:
Custom Process CostSetup:
2MagButton_AdjustedMagPocketDiameter_OKToTool_7Sept23.stp0
Custom Process CostSetup:
Custom Process CostSetup:
Custom Process CostSetup:
Custom Process CostSetup:
Custom Process CostSetup:
3wallet-20230827.stp0
4wallet-20230827.stp0

Budget China PO
Setup: RMB USD
Tooling Change: RMB USD
Additional: RMB USD
Total: RMB USD
Note:
Revision: R
ItemSnap ShotPart Number/NameTooling Shipping BudgetTooling Shipping Amount

Budget China PO
Setup: RMB USD
Tooling Change: RMB USD
Additional: RMB USD
Total: RMB USD
Note:
Revision: R

Project Status & Shipping Notice

ItemPart NameSnap ShotProject StatusNotePart Order QuantityProject Part Order Shipping Date after Sample ApprovalMaterial for SamplesMaterial for ProductionShipping Notice
1keyfob_revisedwallthickness_v05-0625.stp● DFM Approved
● Tool Build Start
● Tool Build Complete
● Samples Sent
● Custom Process
● Custom Process
● Custom Process
● Procured
● Received
● Procured
● Received






2MagButton_AdjustedMagPocketDiameter_OKToTool_7Sept23.stp● DFM Approved
● Tool Build Start
● Tool Build Complete
● Samples Sent
● Custom Process
● Custom Process
● Custom Process
● Custom Process
● Custom Process
● Procured
● Received
● Procured
● Received
3wallet-20230827.stp● DFM Approved
● Tool Build Start
● Tool Build Complete
● Samples Sent
● Procured
● Received
● Procured
● Received
4wallet-20230827.stp● DFM Approved
● Tool Build Start
● Tool Build Complete
● Samples Sent
● Procured
● Received
● Procured
● Received

Discussion Board


Files





1050 Walnut Ridge Drive, Hartland, Wisconsin 53029 (©) 2024 ICOMold By Fathom. All rights reserved.